MV/LV Custom Design

Modular electrical design delivery from medium-voltage to low-voltage distribution.

Key Takeaways

  • ADAT Power delivers modular electrical architecture for MV/LV distribution — standardized functional units + unified busbar interfaces turn one-off engineering into reusable architecture assets.
  • Maintenance efficiency: +40%; switchgear footprint: −30% — verified on deployed modular designs.
  • Four-layer deliverables: Electrical Architecture (single-line diagram, short-circuit & selectivity calc) → Modules & Cubicles (unit definitions, busbar spec) → Production-Ready Files (BOM, wiring, IEC/GB/UL declaration) → Expansion Reserve (busbar margin, reserved cubicles).
  • Design cycle 3–7 working days; up to 15 days for non-standard architecture confirmation. Deliverables in editable DWG / PDF / Excel BOM, no proprietary lock-in — design IP belongs to the client.

MV/LV Custom Design

Modular electrical design delivery from medium-voltage to low-voltage distribution.

The Bottleneck Is Not Manufacturing — It's Design Definition

Load list mismatch with short-circuit parameters, selective protection problems planted at the drawing stage, cubicles too wide for site corridors, inconsistent cubicle types across projects making spare parts impossible to standardize. Modular design does not shrink the cabinet — it uses standardized functional units and unified busbar interfaces to convert one-off engineering into reusable architecture assets.

40%
Maintenance Efficiency Improvement
30%
Switchgear Footprint Reduction
3–7 d
Standard Design Delivery Cycle
15 d
Max Cycle with Non-Standard Confirmation

Delivery Structure & What You Get

Delivery Layer Specific Files / Outputs What It Means for You
Electrical Architecture Single-line diagram (one-line), short-circuit & protection coordination calculation, selectivity analysis Breaker breaking capacity matches the short-circuit current at its installation point; protection does not trip indiscriminately
Modules & Cubicles Standardized functional unit definitions, cubicle arrangement, busbar system & modular interface specification Feeder units are pluggable-replaceable; new cubicles dock directly via reserved interfaces
Production-Ready Files BOM, secondary schematic, wiring diagrams, FAT/SAT test plan, compliance declaration (IEC / GB / UL per target market) Factory builds to a frozen revision; acceptance is backed by documented standards
Expansion Reserve Busbar margin, empty cubicle positions, standardized secondary communication interface convention Next-phase expansion has shorter outage windows; commissioning cycle is more predictable
📦
Delivery Cycle: Standard design cycle 3–7 working days; projects involving non-standard architecture confirmation typically freeze the scheme within 7–15 days. Deliverables are provided as editable DWG, PDF, and Excel BOM — no proprietary software or follow-up subscription required. Design outputs belong to you and can be freely executed by any manufacturer.

Who This Is For — and Who It Isn't

✅ Suitable For

  • Equipment manufacturers, system integrators and EPC firms with a continuous distribution project pipeline but without the capacity to maintain a full in-house electrical design team
  • Group customers needing to replicate the same distribution architecture across multiple sites or projects
  • Project owners who have locked in equipment procurement channels and only need manufacturable, compliant drawing definitions

⛔ Not Suitable For

  • Teams expecting the design firm to "experimentally discover" product positioning or customer profiles — modular design amplifies already-validated architectures; it does not make market judgments for you
  • Procurement decisions that only compare drawing unit price and do not evaluate how design defects get amplified downstream

Common Questions

Does modular design limit customization freedom?
No. Modular constraints operate at the interface level (busbar specifications, cabinet width modules, secondary terminal rules), not at the functional level. Feeder count, protection configuration, incoming/outgoing modes, and intelligent monitoring modules can all be configured per project on top of standardized interfaces. What modular design eliminates is the hidden cost of reinventing a new busbar system for every project.
We don't manufacture cubicles ourselves, only do project EPC — is this service applicable?
Yes. Design deliverables are manufacturer-neutral. Drawings and BOMs are not tied to any specific manufacturer — you can have them produced by your existing suppliers or use them for tender comparison. The service boundary is "define what to build and by what standards to accept", not force equipment procurement.
Is the extra cost of modular design worth it vs. directly quoting a complete set manufacturer?
It depends on project repeatability. For one-off projects with simple loads, direct quoting may be more economical. But when a project has phased expansion potential or needs to replicate similar distribution architectures across sites, the one-time investment in busbar margin reservation, cubicle extension interfaces, and spare part interchangeability gets amortized over every subsequent expansion. On-site rectification costs from short-circuit capability mismatch or selective protection failure typically cost several times the design fee itself.

Applicable Scenarios

Urban distribution networks, industrial plants, commercial complexes, hospitals, data centers, rail transit, photovoltaic power stations, energy storage stations, residential areas